Friday, April 8, 2011

Just a quick post to let you see a picture of the latest arrival on site.

Saturday, March 19, 2011

It's been a busy week of progress and setbacks. There was the steel beam thing, the escaping sheep thing, the poly-tunnel thing the planting thing, the paddy's day thing and the ongoing imminent arrival of our baby thing.

The steel beam thing:
It arrived on Tuesday, 500Kg of unforgiving I R.S.J. of course this was perfect. Tuesday was the day when the lads with the power tools were meant to be here to move and install it. Only problem was that although the steel was here the lads were not. So it was going to sit there outside the back door tripping me up for a week and this would be OK but it would stall the erection of the scaffolding (because the scaffolding had to go right outside the back door too), so it had to move. Opinions were sought as they usually are and then roundly ignored as they usually are and I decided that rather than get ten burley lads and pay them half a days wages each I would move the bugger myself. Amazing what you can do with a 2 tonne jack, a few logs and a big lever.



And here's the turn:
Full credit to Dave who arrived just in time to help me get it up onto the slab.

Some mounts ago D and I spent some quality time in the garden planting bulbs. I seem destined not to do well with flowers and I think I should just give it up as a bad job because no sooner had the bulbs begun to pop their heads out of the soil than the sheep escaped and eat them. Don't know why this bugs me so much. I think it's more to do with the fact that they were this whole father daughter co-operative exercise that has now been reduced to sheep poop. At least I get to eat the perpetrators.

The poly-tunnel thing is very exciting, I was knocking it up bit by bit than Dave arrived and finished the basic from in an afternoon. having handy friends is very handy. There's still lots to do but we can now see just how big it's going to be. Big is how big it's going to be...cool.

F has been a trooper, not content with incubating the baby she has been propagating seeds. March is here, spring is upon us and here we go again. Father in law Pat has been here with his spade. Now I can't dig cause of the boketty knee (coming along nicely thanks for asking but still very painful), but that's OK cause Pat is doing it all for me. I do hope he's enjoying himself because he's basically dug the entire vegetable plot in a week (usually takes me a month). Derek our architect arrived the day of the steel beam move to find me taking a rest and Pat in the garden working away like a machine. "that's the way to garden" he quipped to me.

the paddy's day thing, well what can you say, I got ropped into holding a banner for the local playschool but it was great fun, D had a ball with her cousins. F had a rest for the afternoon but by the time D and I got home we were both exhausted and when F and I had got her to bed I collapsed in my own bed and slept for 3 hours. 'Twas a bit of craik though. Parade was OK though it definitely had a tunnel of goats feel to it.

D has just woken up gotta go, baby is arriving in the next 2 weeks or so.......AAAAAAAAAAAAAAHHHHHHHHHHHHHHHHHHHHHHH!!!!!!!!!!!!!!!

Wednesday, March 2, 2011

In ancient times priests would gut an animal and fiddle with its insides in some vain attempt to divine future events. I've sometimes wondered what on earth they thought they were at. What desperate turn of events or tortuous course of history could drive an intelligent rational mind to think that fondling a sheep's stinky bits could help tell the future? Of course those lads were building pyramids. I'm merly building an extension and I must confess I've been eying the spare rooster with a degree of mystic curiosity. See the thing is this. It's not just building an extension. The extension itself is simple. walls here, insulation there, a roof and some windows would be nice. but the thing is..........timing.

We have a baby coming soon, I'm really looking forward to his / her arrival. I't's not like first time around where you don't know what the hell you're getting into. We both know exactly what hell we're getting into, insomnia hell and strange smells hell. but it's a baby and that's a beautiful, wonderful, squirmy, noisy, smelly thing. but the timing, the timing is like when you're playing football and running for the ball, there's an open net, you sense a defender closing in on the right and you just don't know for sure but it might, just might be possible that you'll get to that ball before he does and if you keep your cool and don't fuck it up the goal is yours for the taking. And everything is slowed down and you can't know, won't know until you reach that ball if you're going to succeed. that's how I feel right now. If the weather keeps right, if steel arrives on time, is materials and labor show up when they are supposed to, if I don't pull any more ligaments, if help arrives when I need it and a baby doesn't come early then I just might get the worst of this build finished before baby arrives, and that would be great. on the other hand If things don't work out we could be introducing the child to the world through the vehicle of a house with no walls, filled with masonry dust and ringing with the screech of some very nasty power tools.

A coward would call a halt right now and say, we'll keep our walls intact and stop the build for another 6 mounts. A fool would plough ahead recklessly and with wild abandon. I find myself torn between two mentors. I plan ahead, I chase down suppliers, I refine quotes and seek diagrammatic explanations. I also find myself looking up at the sky, sniffing the air and wondering if it's going to rain. I scene I should plough ahead, at least a little bit, I sense that it will all be great, not just OK but great, but I can't be sure and the consequences of failure are pretty bad and I can't know any more than I know now, can't plan any more than I've planned so I just have to run for the ball and see what happens. And it's the not knowing and not being able to know that drives you crazy so in desperation, in desperation you start to think well what way can I resolve this situation, what way can I get to a point where I have some sign some indication of how this will pan out, and it's at that point where you reach the limit of the rational when you begin to wonder well, maybe if I cut open a chicken?

Monday, February 21, 2011

Well, it's been two weeks of "progress" on the build but to be honest it doesn't quite feel that way.
We've succeeded in pouring the slab and turning the lawn into a miniature of the great lakes. Michael is laying blocks as we speak so finally walls are going up. I strained ligaments and probably tore some cartilage in my knee while playing football last week so although I am off the crutches I'm still quite the gimp (nothing new there I hear you say). My injury has brought quite a few inconveniences but on the plus side I have now finished watching all 5 series of the wire (as if I wasn't depresses and cynical enough).
Weather has been the big enemy, I mentioned the lawn, it really has been torn to bits and the fact that the trenches are permanently filled with water is testament to just how much rain we have been getting. But today is a beautiful day. Work is progressing and hopefully by the end of the week we will be up to the first floor.

Sunday, February 6, 2011

The BIG DIG

We've started. At last we have committed to building the extension and actually cut a sod. White a few sod's in fact cause we had a mighty big digger doing the cutting. Here was me expecting one of those mini digger yokes but Gerry (the dude doing the digging) turned up with a machine fit to gauge out the sues. Made light work of it though. we started last Tuesday. A perfect day, bright and dry, measured up, dug the trenches and marked the levels for the pour. see how I'm all down with the technical terms now. height and pour and the like. That's cause I'm a builder now......well at least an apprentice laborer / project manager. the rest of the country has given up construction as a bad game but as usual I'm a bit slow on the uptake.
Wednesday we poured the concrete, that was easy, the two lads (Gerry and Mikey), did the work and I erm....supervised and nodded approvingly from time to time. It was all over by lunch time and the concrete set by evening which meant that on Friday another Michael could arrive and start laying blocks and I could keep him supplied with blocks, cement and offers of tea.
So week one ended with the foundations poured and the sub-floor block work completed. We aren't quite out of the ground yet. I still need to fill the cavity in the block work with cement and sand then we can go on to complete the floor slab but fortunately we have had the worst weather over the past few days so I've achieved nothing. today is supposed to be a better day but I would point out that it is 4:58 am and I am writing this because the wind is howling so loudly outside that it is keeping me awake. we can only wait and see what the morning brings.